From consultation to completion, we handle every step of your project professionally
- 1
Assessment, Design & Light Analysis
Our Florida-licensed contractor visits your property to evaluate existing pool enclosure roof structure and framing, assess structural capacity for skylight integration, analyze optimal placement for even light distribution throughout pool area, discuss your preferences for light levels and operation (fixed vs. operable), and evaluate any special considerations like ceiling fans, light fixtures, or structural beams. You receive expert recommendations with 3D renderings showing expected light patterns and multiple configuration options with detailed pricing.
Timeline: On-site visit 60-90 minutes plus design development
- 2
Engineering & Permitting
Complete structural engineering review by Florida-licensed Professional Engineer to ensure roof structure can safely support skylights and required reinforcement. Preparation of complete building permit package including structural calculations, installation drawings, and product specifications. Coordination with local building department for permit submission and approval. For properties with HOA requirements, we provide all necessary documentation and renderings for architectural review committee approval.
Timeline: 2-3 weeks depending on municipality requirements
- 3
Pre-Installation Preparation
After permit approval, we schedule installation coordinating with your availability and weather forecast (clear weather required). All materials are pre-ordered including skylights, flashing components, structural reinforcement lumber or steel, fasteners, and sealants. Materials undergo quality inspection at our facility before transport to job site. We coordinate with electrician if motorized skylights specified.
Timeline: 1-2 weeks after permit approval
- 4
Professional Installation
Our licensed installation crew arrives with all materials, tools, and safety equipment. Installation sequence includes: protecting pool and surrounding area with tarps, precise marking and cutting of roof panel openings, installation of structural reinforcement around openings, mounting of skylight units with proper shimming and leveling, installation of custom weatherproof flashing system with EPDM gaskets, interior trim and finishing, electrical connection for motorized units. Complete water-tightness testing performed using hose test. Quality control inspection of all mounting, flashing, and sealing.
Timeline: 1-2 days for 3-5 skylights depending on complexity
- 5
Final Inspection, Testing & Training
Coordination of final building department inspection ensuring all work meets approved plans and Florida Building Code. Comprehensive leak testing using extended water spray test. Operation testing of all moving components on operable units. Customer training covering operation procedures for motorized units, maintenance recommendations, cleaning techniques, and warranty coverage. You receive complete documentation including permits, engineering drawings, product warranties, operation manuals, and maintenance schedule.
Timeline: 1-2 days after installation completion